Mike and went to Rock Hall to take care of the last items to get the sailboat ready for the winter. Got the batteries, opened the drain in the bottom, oiled the engine, and filled the gas tank. Took what was left in the boat and bid it goodbye until April. We have a launch date of May 1 so only 151 day to launch!